References
[1]
C.
Bandt and B. Pompe, “Permutation entropy: A natural complexity
measure for time series,” Physical Review Letters, vol.
88, no. 17, p. 174102, 2002, doi: 10.1103/PhysRevLett.88.174102.
[2]
J.
S. Richman and J. R. Moorman, “Physiological time-series analysis
using approximate entropy and sample entropy,” American
Journal of Physiology-Heart and Circulatory Physiology, vol. 278,
no. 6, pp. H2039–H2049, 2000, doi: 10.1152/ajpheart.2000.278.6.H2039.
[3]
H.
E. Hurst, “Long-term storage capacity of reservoirs,”
Transactions of the American Society of Civil Engineers, vol.
116, no. 1, pp. 770–799, 1951, doi: 10.1061/taceat.0006518.
[4]
C.-K. Peng, S. V. Buldyrev, S. Havlin, M.
Simons, H. E. Stanley, and A. L. Goldberger, “Mosaic organization
of DNA nucleotides,” Physical Review E,
vol. 49, no. 2, pp. 1685–1689, 1994, doi: 10.1103/PhysRevE.49.1685.
[5]
D.
A. Dickey and W. A. Fuller, “Distribution of the estimators for
autoregressive time series with a unit root,” Journal of the
American Statistical Association, vol. 74, no. 366a, pp. 427–431,
1979, doi: 10.1080/01621459.1979.10482531.
[6]
D.
Kwiatkowski, P. C. B. Phillips, P. Schmidt, and Y. Shin, “Testing
the null hypothesis of stationarity against the alternative of a unit
root,” Journal of Econometrics, vol. 54, no. 1–3, pp.
159–178, 1992, doi: 10.1016/0304-4076(92)90104-Y.
[7]
R.
J. Hyndman and G. Athanasopoulos, Forecasting: Principles and
practice, 3rd ed. Melbourne, Australia: OTexts, 2021.
[8]
S.
Kaufman, S. Rosset, C. Perlich, and O. Stitelman, “Leakage in data
mining: Formulation, detection, and avoidance,” ACM
Transactions on Knowledge Discovery from Data, vol. 6, no. 4, pp.
15:1–15:21, 2012, doi: 10.1145/2382577.2382579.
[9]
G.
V. Cormack, C. L. A. Clarke, and S. Büttcher, “Reciprocal rank
fusion outperforms Condorcet and individual rank learning
methods,” in Proceedings of the 32nd international ACM SIGIR
conference on research and development in information retrieval,
2009, pp. 758–759. doi: 10.1145/1571941.1572114.
[10]
Y.
Benjamini and Y. Hochberg, “Controlling the false discovery rate:
A practical and powerful approach to multiple testing,”
Journal of the Royal Statistical Society: Series B
(Methodological), vol. 57, no. 1, pp. 289–300, 1995, doi: 10.1111/j.2517-6161.1995.tb02031.x.
[11]
R.
J. Hyndman, E. Wang, and N. Laptev, “Large-scale unusual time
series detection,” in Proceedings of the IEEE international
conference on data mining workshop, 2015, pp. 1616–1619. doi: 10.1109/ICDMW.2015.104.
[12]
T.
Hong and S. Fan, “Probabilistic electric load forecasting: A
tutorial review,” International Journal of Forecasting,
vol. 32, no. 3, pp. 914–938, 2016, doi: 10.1016/j.ijforecast.2015.11.011.
[13]
T.
Hastie, R. Tibshirani, and J. Friedman, The elements of statistical
learning: Data mining, inference, and prediction, 2nd ed. New York:
Springer, 2009. doi: 10.1007/978-0-387-84858-7.
[14]
S.
Shalev-Shwartz and S. Ben-David, Understanding machine learning:
From theory to algorithms. Cambridge University Press, 2014.
[15]
C.
Spearman, “The proof and measurement of association between two
things,” The American Journal of Psychology, vol. 15,
no. 1, p. 72, Jan. 1904, doi: 10.2307/1412159.
[16]
G.
J. Székely, M. L. Rizzo, and N. K. Bakirov, “Measuring and testing
dependence by correlation of distances,” The Annals of
Statistics, vol. 35, no. 6, pp. 2769–2794, Dec. 2007, doi: 10.1214/009053607000000505.
[17]
F. Petropoulos, D.
Apiletti, V. Assimakopoulos, M. Z. Babai, et al.,
“Forecasting: Theory and practice,” International
Journal of Forecasting, vol. 38, no. 3, pp. 705–871, 2022, doi: 10.1016/j.ijforecast.2021.11.001.
[18]
S.
Haben, S. Arora, G. Giasemidis, M. Voss, and D. V. Greetham,
“Review of low voltage load forecasting: Methods, applications,
and recommendations,” Applied Energy, vol. 304, p.
117798, 2021, doi: 10.1016/j.apenergy.2021.117798.
[19]
S.
Haben, G. Giasemidis, F. Ziel, and S. Arora, “Short term load
forecasting and the effect of temperature at the low voltage
level,” International Journal of Forecasting, vol. 35,
no. 4, pp. 1469–1484, 2019, doi: 10.1016/j.ijforecast.2018.10.007.
[20]
Å.
L. Sørensen, K. B. Lindberg, I. Sartori, and I. Andresen,
“Residential electric vehicle charging datasets from apartment
buildings,” Data in Brief, vol. 36, p. 107105, 2021,
doi: 10.1016/j.dib.2021.107105.
[21]
T.
Hong, P. Pinson, Y. Wang, R. Weron, D. Yang, and H. Zareipour,
“Energy forecasting: A review and outlook,” IEEE Open
Access Journal of Power and Energy, vol. 7, pp. 376–388, 2020, doi:
10.1109/OAJPE.2020.3029979.
[22]
T.
Gneiting, “Making and evaluating point forecasts,”
Journal of the American Statistical Association, vol. 106, no.
494, pp. 746–762, 2011, doi: 10.1198/jasa.2011.r10138.
[23]
R.
Sevlian and R. Rajagopal, “A scaling law for short term load
forecasting on varying levels of aggregation,” International
Journal of Electrical Power & Energy Systems, vol. 98, pp.
350–361, 2018, doi: 10.1016/j.ijepes.2017.10.032.
[24]
C.
Bergmeir, R. J. Hyndman, and B. Koo, “A note on the validity of
cross-validation for evaluating autoregressive time series
prediction,” Computational Statistics & Data
Analysis, vol. 120, pp. 70–83, Apr. 2018, doi: 10.1016/j.csda.2017.11.003.
[25]
V.
Cerqueira, L. Torgo, and I. Mozetič, “Evaluating time series
forecasting models: An empirical study on performance estimation
methods,” Machine Learning, vol. 109, no. 11, pp.
1997–2028, Oct. 2020, doi: 10.1007/s10994-020-05910-7.
[26]
S.
Ben Taieb, G. Bontempi, A. F. Atiya, and A. Sorjamaa, “A review
and comparison of strategies for multi-step ahead time series
forecasting based on the NN5 forecasting competition,” Expert
Systems with Applications, vol. 39, no. 8, pp. 7067–7083, 2012,
doi: 10.1016/j.eswa.2012.01.039.
[27]
M.
Marcellino, J. H. Stock, and M. W. Watson, “A comparison of direct
and iterated multistep AR methods for forecasting macroeconomic time
series,” Journal of Econometrics, vol. 135, no. 1–2, pp.
499–526, Nov. 2006, doi: 10.1016/j.jeconom.2005.07.020.
[28]
T.
Gneiting and A. E. Raftery, “Strictly proper scoring rules,
prediction, and estimation,” Journal of the American
Statistical Association, vol. 102, no. 477, pp. 359–378, Mar. 2007,
doi: 10.1198/016214506000001437.
[29]
R.
Koenker and G. Bassett, “Regression quantiles,”
Econometrica, vol. 46, no. 1, p. 33, Jan. 1978, doi: 10.2307/1913643.
[30]
A.
Kaur, L. Nonnenmacher, and C. F. M. Coimbra, “Net load forecasting
for high renewable energy penetration grids,” Energy,
vol. 114, pp. 1073–1084, Nov. 2016, doi: 10.1016/j.energy.2016.08.067.
[31]
M.
Beichter, K. Phipps, M. M. Frysztacki, R. Mikut, V. Hagenmeyer, and N.
Ludwig, “Net load forecasting using different aggregation
levels,” Energy Informatics, vol. 5, no. S1, 2022, doi:
10.1186/s42162-022-00213-8.
[32]
Y.
Wang, N. Zhang, Q. Chen, D. S. Kirschen, P. Li, and Q. Xia,
“Data-driven probabilistic net load forecasting with high
penetration of behind-the-meter PV,” IEEE Transactions on
Power Systems, vol. 33, no. 3, pp. 3255–3264, May 2018, doi: 10.1109/tpwrs.2017.2762599.
[33]
R.
F. Engle, “Autoregressive conditional heteroscedasticity with
estimates of the variance of united kingdom inflation,”
Econometrica, vol. 50, no. 4, p. 987, 1982, doi: 10.2307/1912773.
[34]
K.
Bandara, R. J. Hyndman, and C. Bergmeir, “MSTL: A seasonal-trend
decomposition algorithm for time series with multiple seasonal
patterns,” International Journal of Operational
Research, vol. 52, no. 1, pp. 79–98, 2025, doi: 10.1504/ijor.2025.143957.
[35]
G.
M. LJUNG and G. E. P. BOX, “On a measure of lack of fit in time
series models,” Biometrika, vol. 65, no. 2, pp. 297–303,
Aug. 1978, doi: 10.1093/biomet/65.2.297.
[36]
W.
A. Broock, J. A. Scheinkman, W. D. Dechert, and B. LeBaron, “A
test for independence based on the correlation dimension,”
Econometric Reviews, vol. 15, no. 3, pp. 197–235, Jan. 1996,
doi: 10.1080/07474939608800353.
[37]
R.
L. Brown, J. Durbin, and J. M. Evans, “Techniques for testing the
constancy of regression relationships over time,” Journal of
the Royal Statistical Society Series B: Statistical Methodology,
vol. 37, no. 2, pp. 149–163, Jan. 1975, doi: 10.1111/j.2517-6161.1975.tb01532.x.
[38]
A.
Kraskov, H. Stögbauer, and P. Grassberger, “Estimating mutual
information,” Physical Review E, vol. 69, no. 6, 2004,
doi: 10.1103/physreve.69.066138.
[39]
G.
Goerg, “Forecastable component analysis,” in
Proceedings of the 30th international conference on machine
learning, in Proceedings of machine learning research, no. 2, vol.
28. PMLR, 2013, pp. 64–72. Available: https://proceedings.mlr.press/v28/goerg13.html
[40]
H.
Akaike, “A new look at the statistical model
identification,” IEEE Transactions on Automatic Control,
vol. 19, no. 6, pp. 716–723, Dec. 1974, doi: 10.1109/tac.1974.1100705.
[41]
G.
Schwarz, “Estimating the dimension of a model,” The
Annals of Statistics, vol. 6, no. 2, pp. 461–464, Mar. 1978, doi:
10.1214/aos/1176344136.
[42]
C.
W. J. Granger and P. Newbold, “Spurious regressions in
econometrics,” Journal of Econometrics, vol. 2, no. 2,
pp. 111–120, 1974, doi: 10.1016/0304-4076(74)90034-7.
[43]
G.
E. P. Box, G. M. Jenkins, G. C. Reinsel, and G. M. Ljung, Time
series analysis: Forecasting and control, 5th ed. Hoboken, NJ:
Wiley, 2015.
[44]
S.
Chatterjee, “A new coefficient of correlation,” Journal
of the American Statistical Association, vol. 116, no. 536, pp.
2009–2022, 2021, doi: 10.1080/01621459.2020.1758115.
[45]
L.
Breiman, “Random forests,” Machine Learning, vol.
45, no. 1, pp. 5–32, 2001, doi: 10.1023/A:1010933404324.
[46]
F.
X. Diebold and R. S. Mariano, “Comparing predictive
accuracy,” Journal of Business & Economic
Statistics, vol. 13, no. 3, pp. 253–263, 1995, doi: 10.1080/07350015.1995.10524599.
[47]
L.
J. Tashman, “Out-of-sample tests of forecasting accuracy: An
analysis and review,” International Journal of
Forecasting, vol. 16, no. 4, pp. 437–450, 2000, doi: 10.1016/S0169-2070(00)00065-0.
[48]
C.
Dwork, R. Kumar, M. Naor, and D. Sivakumar, “Rank aggregation
methods for the web,” in Proceedings of the 10th
international conference on world wide web, 2001, pp. 613–622. doi:
10.1145/371920.372165.
[49]
A.
Faustine and L. Pereira, “FPSeq2Q: Fully
parameterized sequence to quantile regression for net-load forecasting
with uncertainty estimates,” IEEE Transactions on Smart
Grid, vol. 13, no. 3, pp. 2440–2451, 2022, doi: 10.1109/TSG.2022.3148699.
[50]
A.
Faustine, N. J. Nunes, and L. Pereira, “Efficiency through
simplicity: MLP-based approach for net-load forecasting
with uncertainty estimates in low-voltage distribution networks,”
IEEE Transactions on Power Systems, vol. 40, no. 1, pp. 46–56,
2025, doi: 10.1109/TPWRS.2024.3400123.
[51]
A.
Faustine and L. Pereira, “Enhancing LV system
resilience through probabilistic forecasting of interdependent
variables: Voltage, reactive and active power,” in CIRED
chicago workshop 2024: Resilience of electric distribution systems,
in IET conference proceedings, no. 27, vol. 2024. 2025, pp. 27–31. doi:
10.1049/icp.2024.2555.
[52]
X.
Wang, K. Smith, and R. Hyndman, “Characteristic-based clustering
for time series data,” Data Mining and Knowledge
Discovery, vol. 13, no. 3, pp. 335–364, 2006, doi: 10.1007/s10618-005-0039-x.
[53]
R.
J. Hyndman and A. B. Koehler, “Another look at measures of
forecast accuracy,” International Journal of
Forecasting, vol. 22, no. 4, pp. 679–688, 2006, doi: 10.1016/j.ijforecast.2006.03.001.
[54]
A.
H. Murphy, “Skill scores based on the mean square error and their
relationships to the correlation coefficient,” Monthly
Weather Review, vol. 116, no. 12, pp. 2417–2424, 1988, doi: 10.1175/1520-0493(1988)116<2417:SSBOTM>2.0.CO;2.
[55]
A.
H. Murphy, “What is a good forecast? An essay on the nature of
goodness in weather forecasting,” Weather and
Forecasting, vol. 8, no. 2, pp. 281–293, 1993, doi: 10.1175/1520-0434(1993)008<0281:WIAGFA>2.0.CO;2.
[56]
J.
H. Friedman, “Greedy function approximation: A gradient boosting
machine,” The Annals of Statistics, vol. 29, no. 5, pp.
1189–1232, 2001, doi: 10.1214/aos/1013203451.
[57]
P.
D. Welch, “The use of fast fourier transform for the estimation of
power spectra: A method based on time averaging over short, modified
periodograms,” IEEE Transactions on Audio and
Electroacoustics, vol. 15, no. 2, pp. 70–73, 1967, doi: 10.1109/TAU.1967.1161901.
[58]
A.
Azzalini and A. Capitanio, “Distributions generated by
perturbation of symmetry with emphasis on a multivariate skew t-distribution,” Journal
of the Royal Statistical Society: Series B (Statistical
Methodology), vol. 65, no. 2, pp. 367–389, 2003, doi: 10.1111/1467-9868.00391.
[59]
H.
Hewamalage, K. Ackermann, and C. Bergmeir, “Forecast evaluation
for data scientists: Common pitfalls and best practices,”
Data Mining and Knowledge Discovery, vol. 37, no. 2, pp.
788–832, 2023, doi: 10.1007/s10618-022-00894-5.
[60]
S.
Makridakis, E. Spiliotis, and V. Assimakopoulos, “M5
accuracy competition: Results, findings, and conclusions,”
International Journal of Forecasting, vol. 38, no. 4, pp.
1346–1364, 2022, doi: 10.1016/j.ijforecast.2021.11.013.
[61]
S.
Makridakis, E. Spiliotis, and V. Assimakopoulos, “Statistical and
machine learning forecasting methods: Concerns and ways forward,”
PLOS ONE, vol. 13, no. 3, p. e0194889, 2018, doi: 10.1371/journal.pone.0194889.
[62]
R.
Giacomini and H. White, “Tests of conditional predictive
ability,” Econometrica, vol. 74, no. 6, pp. 1545–1578,
2006, doi: 10.1111/j.1468-0262.2006.00718.x.
[63]
P.
R. Hansen, A. Lunde, and J. M. Nason, “The model confidence
set,” Econometrica, vol. 79, no. 2, pp. 453–497, 2011,
doi: 10.3982/ECTA5771.
[64]
K.
Hornik, M. Stinchcombe, and H. White, “Multilayer feedforward
networks are universal approximators,” Neural Networks,
vol. 2, no. 5, pp. 359–366, 1989, doi: 10.1016/0893-6080(89)90020-8.
[65]
A.
Zeng, M. Chen, L. Zhang, and Q. Xu, “Are transformers effective
for time series forecasting?” in Proceedings of the AAAI
conference on artificial intelligence, 2023, pp. 11121–11128. doi:
10.1609/aaai.v37i9.26317.
[66]
C.
Challu, K. G. Olivares, B. N. Oreshkin, F. Garza Ramirez, M.
Mergenthaler Canseco, and A. Dubrawski, “NHITS:
Neural hierarchical interpolation for time series forecasting,”
in Proceedings of the AAAI conference on artificial
intelligence, 2023, pp. 6989–6997. doi: 10.1609/aaai.v37i6.25854.
[67]
S.
Hochreiter and J. Schmidhuber, “Long short-term memory,”
Neural Computation, vol. 9, no. 8, pp. 1735–1780, 1997, doi: 10.1162/neco.1997.9.8.1735.
[68]
W.
K. Newey and K. D. West, “A simple, positive semi-definite,
heteroskedasticity and autocorrelation consistent covariance
matrix,” Econometrica, vol. 55, no. 3, pp. 703–708,
1987, doi: 10.2307/1913610.
[69]
A.
E. Hoerl and R. W. Kennard, “Ridge regression: Biased estimation
for nonorthogonal problems,” Technometrics, vol. 12, no.
1, pp. 55–67, 1970, doi: 10.1080/00401706.1970.10488634.
[70]
R.
J. Hyndman, A. B. Koehler, R. D. Snyder, and S. Grose, “A state
space framework for automatic forecasting using exponential smoothing
methods,” International Journal of Forecasting, vol. 18,
no. 3, pp. 439–454, 2002, doi: 10.1016/S0169-2070(01)00110-8.
[71]
C.
Bergmeir and J. M. Benítez, “On the use of cross-validation for
time series predictor evaluation,” Information Sciences,
vol. 191, pp. 192–213, 2012, doi: 10.1016/j.ins.2011.12.028.
[72]
E.
N. Lorenz, “Atmospheric predictability as revealed by naturally
occurring analogues,” Journal of the Atmospheric
Sciences, vol. 26, no. 4, pp. 636–646, 1969, doi: 10.1175/1520-0469(1969)026<0636:APRBNO>2.0.CO;2.
[73]
G.
Sugihara and R. M. May, “Nonlinear forecasting as a way of
distinguishing chaos from measurement error in time series,”
Nature, vol. 344, no. 6268, pp. 734–741, 1990, doi: 10.1038/344734a0.
[74]
Y.
Chu, H. T. C. Pedro, A. Kaur, J. Kleissl, and C. F. M. Coimbra,
“Net load forecasts for solar-integrated operational grid
feeders,” Solar Energy, vol. 158, pp. 236–246, 2017,
doi: 10.1016/j.solener.2017.09.052.